Managing high-rise building construction projects in Bangladesh requires strict control over raw material consumption, site store inventories, and contractor Running Account (RA) billing. Without digitized construction tracking, site material wastage can erode up to 12% of project profit margins, while contractor billing disputes cause construction delays.
Unova Construction ERP is Bangladesh’s specialized construction software built specifically for real estate developers, site engineers, and project managers. Unova Construction ERP connects architectural Bill of Quantities (BOQ) budgets with field store requisitions, contractor billing, and financial ledgers.
Calculate your construction material savings with our Unova ROI Calculator or explore our Central FAQ Portal.
"Controlling steel rebar and cement usage across 5 building sites was impossible with paper registers. Unova Construction ERP eliminated site material wastage and streamlined contractor RA billing." — Project Director, Landmark Construction Ltd
1. Overview
Construction site management in Bangladesh faces distinct operational challenges:
- Material Wastage & Leakage: Excess cement, rebar tonnage, or tiles ordered beyond BOQ baseline budgets directly shrink developer profit margins.
- Contractor Billing Disputes: Manual measurement sheets lead to disputes with civil, electrical, and plumbing contractors regarding work completion percentages.
- Site-to-Head-Office Silos: Site engineers working offline create delays in material procurement and vendor invoice processing.
Unova Construction ERP resolves these vulnerabilities with automated BOQ locks, mobile store requisitions, and automated contractor billing engines.
2. Key Features & Modules
A. Bill of Quantities (BOQ) Budget Engine
Enforce strict budget limits from day one:
- BOQ Upload: Import structural and architectural estimates (cement bags, steel rebar tons, sand CFT, tiles sq.ft).
- Automated Requisition Locks: Material requisitions exceeding remaining BOQ budgets are flagged for Director approval.
B. Site Store & Goods Received Ledger
Control raw material inventory across building sites:
- Store Receipts (GRN): Storekeepers log incoming material deliveries, verifying supplier delivery chalans against purchase orders.
- Store Issue Tracking: Track raw materials issued to sub-contractors with automated gate passes to prevent theft.
C. Contractor Running Account (RA) Billing
Automate contractor measurement verifications:
- Milestone Billing Verification: Sub-contractors submit RA bills based on completed site measurements.
- Automated Deductions: System auto-deducts advance payments, security deposit retentions (e.g. 10%), and NBR source tax (AIT/VAT).
For complete financial ledger and project P&L integration, read our Finance & Accounts ERP Solution.
3. How It Works
Connect site engineers with corporate procurement:
- Mobile Measurement Upload: Site engineers upload site progress photos and measurement logs directly from their smartphones.
- Vendor Procurement Pipeline: Purchase orders are auto-generated when site store balances drop below minimum safety levels.
For land acquisition and joint-venture landowner share details, explore our ERP for Land Developers Guide.
4. Dashboards & Integration
Unova Construction ERP provides real-time progress analytics for Project Directors and Chief Engineers:
- Construction Milestone Dashboard: Monitor slab casting, brickwork, plastering, and finishing progress against baseline schedules.
- Material Consumption Heatmap: Compare actual material usage per square foot against initial engineering estimates.
5. Implementation Roadmap
Deploying Unova Construction ERP across building sites takes four structured phases:
- Phase 1: BOQ Data Upload (Week 1): Import project BOQ estimates, material items, and contractor masters.
- Phase 2: Site Workflow Setup (Week 2): Setup store approval hierarchies, MR limits, and contractor retention rules.
- Phase 3: Site Engineer Training (Week 3): On-site mobile app training for site engineers and storekeepers.
- Phase 4: Go-Live & Site Monitoring (Ongoing): Launch live store logging with dedicated site support.
6. Business Impact & ROI
| Metric | Manual Site Management | With Unova Construction ERP |
|---|---|---|
| Material Wastage Rate | 8% – 12% | Under 2% (75% Saved) |
| RA Bill Processing Time | 7–10 Days | Under 24 Hours |
| Store Inventory Accuracy | Discrepancies Common | 100% Verified |
| Project Delay Risks | High Delay Risk | On-Schedule Tracking |
Schedule a Personalized Live Walkthrough
Control site costs and eliminate material wastage today. Connect with our construction solution engineers for a customized demonstration.
Book a Free Live Demo | Contact Sales via WhatsApp | Explore All ERP Solutions